subhead_9

Environmental Compliance

Waste Minimization Program Initiation and Implementation

Project involved use of membrane filtration, carbon absorption, and baghouse dust segregation. Treated wastewater was used as make up for subsequent batches and excess waste solvent was utilized as a fuel source for off-site incineration. The system helped reduce 54 percent of the annual waste generated.

Read More »

Environmental Compliance, Industrial Waste Treatment, Past Projects, Previous Projects (Jan 1990 - June 1998)

Hazardous Materials Containment Plan, Portland, OR

Assessed the hazardous materials and waste activities and completed containment plans and designs for 10 businesses adjacent to the Columbia South Shore Slough.

Read More »

Environmental Compliance, Industrial Waste Treatment, Past Projects, Previous Projects (Jan 1990 - June 1998), Storage Tanks & Asbestos Cleanup

RCRA Part B Permit Application Project

Project involved negotiation with state environmental regulators; evaluation of process, groundwater, and waste characteristics information; and development of an interim measure corrective action plan for groundwater protection.

Read More »

Environmental Compliance, Past Projects, Previous Projects (Jan 1990 - June 1998)

Remedial Investigation/Feasibility Study, Redi-Strip of Oregon

Review historical assessment and regulatory files, met with Oregon DEQ to negotiate Phase II work plan and remedial measures, prepared an RI proposal and work plan, implemented RI Work Plan (including soil and groundwater sampling and analysis), and submitted a Draft RI Report to DEQ (project is “in progress”).

Read More »

Environmental Compliance, Past Projects, Phase I Site Assessments

Environmental Investigation and Facility Closure

Conducted a comprehensive environmental investigation of onsite soils, groundwater and soil vapors.

Read More »

Brownfield Remediation, Environmental Compliance, Environmental Due Diligence, Environmental Management, Environmental Risk Assessments, Laboratory Data Collection & Interpretation, Past Projects, Phase I Site Assessments

Environmental Investigation and Site Cleanup Involving Chromium

Project involved preparing a Work Plan which was approved by the Oregon DEQ; collecting soil, sediment, surface water, and groundwater samples; arranging for the samples to be evaluated at a State-certified lab; evaluating the lab data; anddeveloping and implementing a remediation plan for the City (project is ongoing).

Read More »

Environmental Compliance, Laboratory Data Collection & Interpretation, Past Projects, Phase I Site Assessments, Storage Tanks & Asbestos Cleanup

Storm Water Treatment Studies and Monthly Monitoring

Collected storm water samples, prepared and initiated a monthly monitoring program, evaluated laboratory test results, conducted treatability tests using neutralizing agents such as sodium bisulfate, attempted bioremediation treatment with tannic acid, and completed and submitted quarterly reports required by the Oregon Department of Environmental Quality (DEQ).

Read More »

Environmental Compliance, Industrial Waste Treatment, Laboratory Data Collection & Interpretation, Past Projects, Process Control Chemistry

Storm Water Permit Preparation and Environmental File Organization

Completed eight NPDES storm water permit applications following a corporate ownership change (Texaco to Equilon, Inc.) and reorganized the environmental filing system for Texaco’s corporate environmental engineer.

Read More »

Environmental Compliance, Past Projects

Stormwater Pollution Control Plan & Spill Prevention Control and Countermeasure Plan

Completed the SWPC and SPCC plans as required by the City of Portland, Oregon DEQ, and EPA. The plans were written consistent with proper regulatory protocols and were accepted and approved by the agencies.

Read More »

Environmental Compliance, Past Projects, Pollution Prevention

RCRA Spill Contingency Plan, Spill Prevention Control & Countermeasure Plan, and Sampling and Analysis Plan

Short Mountain Landfill, Eugene, Oregon. This project involved completing the following general tasks: (1) developed a RCRA spill contingency plan, an SPCC and facility response plan (FRP), and a Sampling and Analysis Plan as mandated by the Oregon DEQ and the Environmental Protection Agency (Ref.: 40 CFR Part 112 and the Oil Pollution Act [OPA [...]

Read More »

Communications Materials, Environmental Compliance, Industrial Waste Treatment, Past Projects, Pollution Prevention