Review historical assessment and regulatory files, met with Oregon DEQ to negotiate Phase II work plan and remedial measures, prepared an RI proposal and work plan, implemented RI Work Plan (including soil and groundwater sampling and analysis), and submitted a Draft RI Report to DEQ (project is “in progress”).
Phase I Site Assessments
Remedial Investigation/Feasibility Study, Redi-Strip of Oregon
Environmental Compliance, Past Projects, Phase I Site Assessments
Site Investigation, City of Camas, Washington
Completed Phase I and Phase II Environmental Site Assessments including records review, hydrogeologic evaluation, agency file search, personnel interviews, research of environmental investigations on neighboring properties, met with City of Camas to discuss Phase I results, prepared and implemented work plan on a former concrete manufacturing facility in Camas, Washington.
Environmental Investigation and Facility Closure
Conducted a comprehensive environmental investigation of onsite soils, groundwater and soil vapors.
Brownfield Remediation, Environmental Compliance, Environmental Due Diligence, Environmental Management, Environmental Risk Assessments, Laboratory Data Collection & Interpretation, Past Projects, Phase I Site Assessments
Environmental Investigation and Site Cleanup Involving Chromium
Project involved preparing a Work Plan which was approved by the Oregon DEQ; collecting soil, sediment, surface water, and groundwater samples; arranging for the samples to be evaluated at a State-certified lab; evaluating the lab data; anddeveloping and implementing a remediation plan for the City (project is ongoing).
Environmental Compliance, Laboratory Data Collection & Interpretation, Past Projects, Phase I Site Assessments, Storage Tanks & Asbestos Cleanup
Environmental Investigation and Site Cleanup, Washington State
Provided emergency response and site cleanup management services, rented heavy equipment necessary for onsite removal of 80 tons of petroleum contaminated soils, hired a specialized subcontractor to remove and properly dispose of 4,000 gallons of oily wastewater, sampled soil and lake bed sediments, evaluated laboratory data, met with agency representatives of Clark County, WA State Parks, & Department of Ecology to develop a plan ofaction, implement the plan and resolve the problem for the park (project is ongoing).
Environmental Management, Laboratory Data Collection & Interpretation, Past Projects, Phase I Site Assessments
Risk-Based Closure – Warehouse Facility
Initially conducted Phase I and II ESAs, then managed the removal of surface soils and asphalt, then conducted a comprehensive risk-based closure assessment of the subject site using Oregon Department of Environmental Quality RBCA Guidance Document for petroleum-contaminated sites.
Environmental Due Diligence, Environmental Risk Assessments, Past Projects, Phase I Site Assessments
Waste Minimization and Toxics Use Reduction Planning
Nu-Process Vinyl, Inc., Madras, Oregon
Owner/Principal Brent Jorgensen Served as Project Manager.
Conducted an inventory and assessed the toxic use and hazardous waste management practices, identified and evaluated alternative technologies and substitute products, and prepared economic comparisons and waste minimization goals.
Past Projects, Phase I Site Assessments, Previous Projects (Jan 1990 - June 1998)
Environmental Assessment, Confidential Semiconductor Manufacturer
Conducted an assessment of the client’s manufacturing facility prior to its sale. A site investigation was also conducted to assess potential soil and groundwater contamination.
Phase I Site Investigation, Confidential Petroleum Oil Distribution Facility
Project involved conducting a complex focused Phase 1 Environmental Site Assessment (ESA) of a bulk oil transfer facility located along the Willamette River on N.W. St. Helens Road in Portland, Oregon.
Environmental Assessments, Confidential Wood Products Manufacturer
Completed 12 environmental assessments for facilities in western Oregon as part of a facilities sale project. Facilities included saw, planer, plywood and veneer mills, glue lamination operations, maintenance facilities, woodwaste disposal sites, effluent lagoons, chemical and petroleum product USTs, and wood treating sites.


