Provided emergency response and site cleanup management services, rented heavy equipment necessary for onsite removal of 80 tons of petroleum contaminated soils, hired a specialized subcontractor to remove and properly dispose of 4,000 gallons of oily wastewater, sampled soil and lake bed sediments, evaluated laboratory data, met with agency representatives of Clark County, WA State Parks, & Department of Ecology to develop a plan ofaction, implement the plan and resolve the problem for the park (project is ongoing).
Laboratory Data Collection & Interpretation
Environmental Investigation and Site Cleanup, Washington State
Environmental Management, Laboratory Data Collection & Interpretation, Past Projects, Phase I Site Assessments
Mold Assessment & Remediation – Oregon & Washington
Prepared a sampling and analysis plan, collected swab, wipe, and air samples for mold, evaluated laboratory test results, prepared remediation plans, and remediated over 10,000 Ft2 surface area in 3 locations.
Laboratory Data Collection & Interpretation, Mold Evaluation & Remediation, Past Projects
Storm Water Treatment Studies and Monthly Monitoring
Collected storm water samples, prepared and initiated a monthly monitoring program, evaluated laboratory test results, conducted treatability tests using neutralizing agents such as sodium bisulfate, attempted bioremediation treatment with tannic acid, and completed and submitted quarterly reports required by the Oregon Department of Environmental Quality (DEQ).
Environmental Compliance, Industrial Waste Treatment, Laboratory Data Collection & Interpretation, Past Projects, Process Control Chemistry
Facility Decontamination and Chromium Cleanup
Columbia Colstor Inc., Woodland, Washington.
Project involved removing sodium bichromate residues from concrete surfaces inside the cold storage warehouse, flushing the inside of approximately 450 pieces of sprinkler pipe and 1500 small parts, removing and containerizing contaminated soil, conducting wipe sampling inside the cold storage warehouse to confirm cleanliness at the subject facility, collecting soil, solid [...]
Environmental Management, Laboratory Data Collection & Interpretation, Past Projects, Storage Tanks & Asbestos Cleanup
Facility Decontamination and Confirmation, Tualatin, Oregon
Provided technical direction and support in closing and decontaminating the subject site, which was used to manufacture semiconductor components from 1986 to 1998.
Environmental Management, Laboratory Data Collection & Interpretation, Past Projects
Eight Tax Credit Applications for Pollution Control Equipment
Creekside has completed (or is in the process of completing) a total of eight tax credit applications for pollution control equipment for firms such as BrucePac, Package Containers, Inc., Rejuvenation, Inc., Times Litho, Leupold & Stevens, and Fujimi America.
Laboratory Data Collection & Interpretation, Past Projects, Pollution Prevention, Tax Credits & Financial Assurance
Regulatory Compliance Assessment and Pollution Prevention Plan
TriQuint Semiconductor, Inc., Beaverton, Oregon
Owner/Principal Brent Jorgensen Served as Project Manager.
Inspected hazardous material and waste storage handling and processing areas, interviewed employees, reviewed in-house and environmental files, evaluated past and existing waste reduction practices, identified hazardous substances used and generated, prepared process description flow charts, determined available reduction opportunities, performed economic analyses for each opportunity, [...]
Environmental Compliance, Laboratory Data Collection & Interpretation, Past Projects, Pollution Prevention, Previous Projects (Jan 1990 - June 1998)
Regulatory Compliance Assessment for a Semiconductor Mfr.
TriQuint Semiconductor, Beaverton, Oregon
Owner/Principal Brent Jorgensen Served as Project Manager.
Inspected hazardous material and waste storage handling and processing areas, interviewed employees, reviewed in-house and environmental files, evaluated past and existing waste reduction practices, identified hazardous substances used and generated, prepared process description flow charts, determined available hazardous waste and toxics use reduction opportunities, performed economic [...]
Environmental Compliance, Laboratory Data Collection & Interpretation, Past Projects, Pollution Prevention, Previous Projects (Jan 1990 - June 1998)
Phase I, II, and III Environmental Investigation/Facility Closure and Site Demolition and Decontamination
Conducted comprehensive Phase I and II ESA’s to establish the lateral and vertical extent of lead contamination at the subject site.
Environmental Management, Laboratory Data Collection & Interpretation, Past Projects, Phase I Site Assessments
Phase I, II Environmental Site Assessments, Texas
Conducted comprehensive Phase I and II ESA’s to establish a baseline prior to a real estate transaction commitment.
Laboratory Data Collection & Interpretation, Past Projects, Phase I Site Assessments


