<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Creekside Environmental Consulting, LLC &#187; Storage Tanks &amp; Asbestos Cleanup</title>
	<atom:link href="http://www.creeksideenvironmental.com/projects/storage-tanks-asbestos-cleanup/feed" rel="self" type="application/rss+xml" />
	<link>http://www.creeksideenvironmental.com</link>
	<description></description>
	<lastBuildDate>Thu, 11 Jun 2009 17:19:59 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>RCRA Closure, Chemical Distribution Center, Portland, Oregon</title>
		<link>http://www.creeksideenvironmental.com/projects/rcra-closure-chemical-center-portland.htm</link>
		<comments>http://www.creeksideenvironmental.com/projects/rcra-closure-chemical-center-portland.htm#comments</comments>
		<pubDate>Sun, 31 May 2009 19:09:43 +0000</pubDate>
		<dc:creator>Brent Jorgensen</dc:creator>
				<category><![CDATA[Environmental Compliance]]></category>
		<category><![CDATA[Environmental Management]]></category>
		<category><![CDATA[Laboratory Data Collection & Interpretation]]></category>
		<category><![CDATA[Past Projects]]></category>
		<category><![CDATA[Phase I Site Assessments]]></category>
		<category><![CDATA[Previous Projects (Jan 1990 - June 1998)]]></category>
		<category><![CDATA[Storage Tanks & Asbestos Cleanup]]></category>

		<guid isPermaLink="false">http://creekside.davidmihm.com/?p=397</guid>
		<description><![CDATA[Investigated soil and groundwater impacts resulting from a release of chromated copper arsenic solution in a warehouse. ]]></description>
			<content:encoded><![CDATA[<h3>Confidential Chemical Distributor, Portland, Oregon<br />
Owner/Principal Brent Jorgensen Served as Project Manager.</h3>
<p>Investigated soil and groundwater impacts resulting from a release of chromated copper arsenic solution in a warehouse. Project involved preparing sampling and analysis plans, health and safety plans (with confined space entry provisions), supervising site cleanup activities, evaluating laboratory test results with appropriate regulatory criteria, recommending disposal options, summarizing the project activities in several reports, and negotiating a groundwater test plan with several DEQ managers.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.creeksideenvironmental.com/projects/rcra-closure-chemical-center-portland.htm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Investigation and Remediation of Lead-Impacted Soil</title>
		<link>http://www.creeksideenvironmental.com/projects/investigation-and-remediation-of-lead-impacted-soil.htm</link>
		<comments>http://www.creeksideenvironmental.com/projects/investigation-and-remediation-of-lead-impacted-soil.htm#comments</comments>
		<pubDate>Sun, 31 May 2009 19:07:15 +0000</pubDate>
		<dc:creator>Brent Jorgensen</dc:creator>
				<category><![CDATA[Environmental Compliance]]></category>
		<category><![CDATA[Environmental Management]]></category>
		<category><![CDATA[Industrial Waste Treatment]]></category>
		<category><![CDATA[Laboratory Data Collection & Interpretation]]></category>
		<category><![CDATA[Past Projects]]></category>
		<category><![CDATA[Phase I Site Assessments]]></category>
		<category><![CDATA[Previous Projects (Jan 1990 - June 1998)]]></category>
		<category><![CDATA[Storage Tanks & Asbestos Cleanup]]></category>

		<guid isPermaLink="false">http://creekside.davidmihm.com/?p=392</guid>
		<description><![CDATA[Investigated soil and potential groundwater impacts at a lead-vinyl products manufacturer from releases of airborne dusts. ]]></description>
			<content:encoded><![CDATA[<h3>Confidential Metal Products Manufacturer, Madras, Oregon<br />
Owner/Principal Brent Jorgensen Served as Project Manager.</h3>
<p> Investigated soil and potential groundwater impacts at a lead-vinyl products manufacturer from releases of airborne dusts. Project included preparing several sampling and analysis plans, coordinating air monitoring and evaluating air containment systems, supervising site investigation and phase 1 cleanup activities, and corresponding with Oregon DEQ environmental cleanup division (ECD) personnel.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.creeksideenvironmental.com/projects/investigation-and-remediation-of-lead-impacted-soil.htm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>RCRA Closure in Washington</title>
		<link>http://www.creeksideenvironmental.com/projects/rcra-closure-in-washington.htm</link>
		<comments>http://www.creeksideenvironmental.com/projects/rcra-closure-in-washington.htm#comments</comments>
		<pubDate>Sun, 31 May 2009 19:04:53 +0000</pubDate>
		<dc:creator>Brent Jorgensen</dc:creator>
				<category><![CDATA[Environmental Compliance]]></category>
		<category><![CDATA[Environmental Management]]></category>
		<category><![CDATA[Past Projects]]></category>
		<category><![CDATA[Phase I Site Assessments]]></category>
		<category><![CDATA[Storage Tanks & Asbestos Cleanup]]></category>

		<guid isPermaLink="false">http://creekside.davidmihm.com/?p=386</guid>
		<description><![CDATA[Work involved investigation of Washington Department of Ecology (WDOE) and USEPA closure requirements, coordination of on-site facility decontamination, confirmation sampling, and facility closure certification.]]></description>
			<content:encoded><![CDATA[<h3>PCB Incinerator Facility in Chehalis, Washington<br />
Owner/Principal Brent Jorgensen Served as Project Manager. </h3>
<p>Work involved investigation of Washington Department of Ecology (WDOE) and USEPA closure requirements, coordination of on-site facility decontamination, confirmation sampling, and facility closure certification.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.creeksideenvironmental.com/projects/rcra-closure-in-washington.htm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Characterization and Remediation of Chromium and Arsenic in Soil and Groundwater</title>
		<link>http://www.creeksideenvironmental.com/projects/remediation-chromium-arsenic-soil-groundwater.htm</link>
		<comments>http://www.creeksideenvironmental.com/projects/remediation-chromium-arsenic-soil-groundwater.htm#comments</comments>
		<pubDate>Sun, 31 May 2009 19:03:21 +0000</pubDate>
		<dc:creator>Brent Jorgensen</dc:creator>
				<category><![CDATA[Environmental Compliance]]></category>
		<category><![CDATA[Environmental Management]]></category>
		<category><![CDATA[Laboratory Data Collection & Interpretation]]></category>
		<category><![CDATA[Past Projects]]></category>
		<category><![CDATA[Phase I Site Assessments]]></category>
		<category><![CDATA[Previous Projects (Jan 1990 - June 1998)]]></category>
		<category><![CDATA[Storage Tanks & Asbestos Cleanup]]></category>

		<guid isPermaLink="false">http://creekside.davidmihm.com/?p=383</guid>
		<description><![CDATA[Investigated soil and groundwater impacts resulting from a release of chromated copper arsenic solution in a warehouse at a chemical distribution facility in northwest Portland, Oregon. ]]></description>
			<content:encoded><![CDATA[<h3>Confidential Chemical Manufacturing Facility, Portland, Oregon<br />
Owner/Principal Brent Jorgensen Served as Project Manager.</h3>
<p>Investigated soil and groundwater impacts resulting from a release of chromated copper arsenic solution in a warehouse at a chemical distribution facility in northwest Portland, Oregon. Project involved preparing sampling and analysis plans, health and safety plans (with confined space entry provisions), supervising site cleanup activities, evaluating laboratory test results with appropriate regulatory criteria, recommending disposal options, summarizing the project activities in several reports, and negotiating a groundwater test plan with the Oregon DEQ.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.creeksideenvironmental.com/projects/remediation-chromium-arsenic-soil-groundwater.htm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CERCLA Superfund Site &#8211; Waste Characterization and Disposal Project</title>
		<link>http://www.creeksideenvironmental.com/projects/cercla-superfund-waste-disposal-project.htm</link>
		<comments>http://www.creeksideenvironmental.com/projects/cercla-superfund-waste-disposal-project.htm#comments</comments>
		<pubDate>Sun, 31 May 2009 18:59:48 +0000</pubDate>
		<dc:creator>Brent Jorgensen</dc:creator>
				<category><![CDATA[Environmental Compliance]]></category>
		<category><![CDATA[Environmental Management]]></category>
		<category><![CDATA[Oregon Superfund Sites / CERCLA]]></category>
		<category><![CDATA[Past Projects]]></category>
		<category><![CDATA[Previous Projects (Jan 1990 - June 1998)]]></category>
		<category><![CDATA[Storage Tanks & Asbestos Cleanup]]></category>

		<guid isPermaLink="false">http://creekside.davidmihm.com/?p=378</guid>
		<description><![CDATA[Project included evaluation of drummed hazardous waste solids and liquids including spent solvents, pentachlorophenol, creosote, paint, and acidic solutions; analysis and interpretation of appropriate and applicable environmental regulations; preparation of disposal permits and applications; and identification of cost-effective waste disposal options.]]></description>
			<content:encoded><![CDATA[<h3>Confidential Hazardous Waste Facility, Portland, Oregon<br />
Owner/Principal Brent Jorgensen Served as Project Manager. </h3>
<p>Project included evaluation of drummed hazardous waste solids and liquids including spent solvents, pentachlorophenol, creosote, paint, and acidic solutions; analysis and interpretation of appropriate and applicable environmental regulations; preparation of disposal permits and applications; and identification of cost-effective waste disposal options.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.creeksideenvironmental.com/projects/cercla-superfund-waste-disposal-project.htm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CERCLA Superfund Site Characterization and Remediation of Lead-Contaminated Soil and Groundwater</title>
		<link>http://www.creeksideenvironmental.com/projects/cercla-lead-contaminated-groundwater.htm</link>
		<comments>http://www.creeksideenvironmental.com/projects/cercla-lead-contaminated-groundwater.htm#comments</comments>
		<pubDate>Sun, 31 May 2009 18:58:23 +0000</pubDate>
		<dc:creator>Brent Jorgensen</dc:creator>
				<category><![CDATA[Environmental Compliance]]></category>
		<category><![CDATA[Environmental Management]]></category>
		<category><![CDATA[Environmental Risk Assessments]]></category>
		<category><![CDATA[Oregon Superfund Sites / CERCLA]]></category>
		<category><![CDATA[Past Projects]]></category>
		<category><![CDATA[Previous Projects (Jan 1990 - June 1998)]]></category>
		<category><![CDATA[Storage Tanks & Asbestos Cleanup]]></category>

		<guid isPermaLink="false">http://creekside.davidmihm.com/?p=376</guid>
		<description><![CDATA[Assisted in the nvestigation soil and groundwater impacts resulting from multiple releases of lead-contaminated sulfuric acid solution at a lead smelting facility in St. Helens, Oregon.]]></description>
			<content:encoded><![CDATA[<h3>Bergsoe Metal Corporation, St. Helens, Oregon<br />
Owner/Principal Brent Jorgensen Served as Task Manager.</h3>
<p>Assisted in the nvestigation soil and groundwater impacts resulting from multiple releases of lead-contaminated sulfuric acid solution at a lead smelting facility in St. Helens, Oregon. Project involved preparing sampling and analysis plans, health and safety plans, supervising site cleanup activities, evaluating laboratory test results with appropriate regulatory criteria, recommending disposal options, summarizing the project activities in several reports, and preparing a risk assessment and RIFS for the Oregon DEQ.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.creeksideenvironmental.com/projects/cercla-lead-contaminated-groundwater.htm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Hazardous Materials Containment Plan, Portland, OR</title>
		<link>http://www.creeksideenvironmental.com/projects/hazardous-materials-containment-plan-portland-or.htm</link>
		<comments>http://www.creeksideenvironmental.com/projects/hazardous-materials-containment-plan-portland-or.htm#comments</comments>
		<pubDate>Sun, 31 May 2009 18:50:56 +0000</pubDate>
		<dc:creator>Brent Jorgensen</dc:creator>
				<category><![CDATA[Environmental Compliance]]></category>
		<category><![CDATA[Industrial Waste Treatment]]></category>
		<category><![CDATA[Past Projects]]></category>
		<category><![CDATA[Previous Projects (Jan 1990 - June 1998)]]></category>
		<category><![CDATA[Storage Tanks & Asbestos Cleanup]]></category>

		<guid isPermaLink="false">http://creekside.davidmihm.com/?p=364</guid>
		<description><![CDATA[Assessed the hazardous materials and waste activities and completed containment plans and designs for 10 businesses adjacent to the Columbia South Shore Slough.]]></description>
			<content:encoded><![CDATA[<h3>Confidential Business Park, Portland, Oregon<br />
Owner/Principal Brent Jorgensen Served as Project Manager. </h3>
<p>Assessed the hazardous materials and waste activities and completed containment plans and designs for 10 businesses adjacent to the Columbia South Shore Slough.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.creeksideenvironmental.com/projects/hazardous-materials-containment-plan-portland-or.htm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Oil Spill Prevention Strategy Plan, Seattle, Washington</title>
		<link>http://www.creeksideenvironmental.com/projects/oil-spill-prevention-seattle.htm</link>
		<comments>http://www.creeksideenvironmental.com/projects/oil-spill-prevention-seattle.htm#comments</comments>
		<pubDate>Sun, 31 May 2009 18:09:20 +0000</pubDate>
		<dc:creator>Brent Jorgensen</dc:creator>
				<category><![CDATA[Past Projects]]></category>
		<category><![CDATA[Pollution Prevention]]></category>
		<category><![CDATA[Previous Projects (Jan 1990 - June 1998)]]></category>
		<category><![CDATA[Storage Tanks & Asbestos Cleanup]]></category>

		<guid isPermaLink="false">http://creekside.davidmihm.com/?p=358</guid>
		<description><![CDATA[Conducted a comprehensive site assessment, reviewed environmental documents, evaluated on-site spill prevention systems, and prepared an oil spill prevention strategy plan. This project also required preparation of a risk analysis which accounted for potential worst case scenario occurrences in the event of bulk fuel tank leaks or complete rupture.]]></description>
			<content:encoded><![CDATA[<h3>Texaco Oil &amp; Refining, Seattle, Washington<br />
Owner/Principal Brent Jorgensen Served as Project Manager.</h3>
<p>Conducted a comprehensive site assessment, reviewed environmental documents, evaluated on-site spill prevention systems, and prepared an oil spill prevention strategy plan. This project also required preparation of a risk analysis which accounted for potential worst case scenario occurrences in the event of bulk fuel tank leaks or complete rupture.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.creeksideenvironmental.com/projects/oil-spill-prevention-seattle.htm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Environmental Investigation and Site Cleanup Involving Chromium</title>
		<link>http://www.creeksideenvironmental.com/projects/chromium-site-cleanup.htm</link>
		<comments>http://www.creeksideenvironmental.com/projects/chromium-site-cleanup.htm#comments</comments>
		<pubDate>Sun, 31 May 2009 17:48:42 +0000</pubDate>
		<dc:creator>Brent Jorgensen</dc:creator>
				<category><![CDATA[Environmental Compliance]]></category>
		<category><![CDATA[Laboratory Data Collection & Interpretation]]></category>
		<category><![CDATA[Past Projects]]></category>
		<category><![CDATA[Phase I Site Assessments]]></category>
		<category><![CDATA[Storage Tanks & Asbestos Cleanup]]></category>

		<guid isPermaLink="false">http://creekside.davidmihm.com/?p=321</guid>
		<description><![CDATA[Project involved preparing a Work Plan which was approved by the Oregon DEQ; collecting soil, sediment, surface water, and groundwater samples; arranging for the samples to be evaluated at a State-certified lab; evaluating the lab data; anddeveloping and implementing a remediation plan for the City (project is ongoing).]]></description>
			<content:encoded><![CDATA[<h3>Environmental Investigation and Site Cleanup of Chromium Impacted Animal Hides, Stella Olson Memorial Park, City of Sherwood, Oregon (November 2004). </h3>
<p>Project involved preparing a Work Plan which was approved by the Oregon DEQ; collecting soil, sediment, surface water, and groundwater samples; arranging for the samples to be evaluated at a State-certified lab; evaluating the lab data; and developing and implementing a remediation plan for the City (project is ongoing).</p>
]]></content:encoded>
			<wfw:commentRss>http://www.creeksideenvironmental.com/projects/chromium-site-cleanup.htm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Preparation of Wastewater Permit Application, Emergency Notification and Planning, and Evaluation of Chromium and Electroless Nickel Plating Processes</title>
		<link>http://www.creeksideenvironmental.com/projects/wastewater-notification-cleanup.htm</link>
		<comments>http://www.creeksideenvironmental.com/projects/wastewater-notification-cleanup.htm#comments</comments>
		<pubDate>Sun, 31 May 2009 17:21:04 +0000</pubDate>
		<dc:creator>Brent Jorgensen</dc:creator>
				<category><![CDATA[Environmental Compliance]]></category>
		<category><![CDATA[Past Projects]]></category>
		<category><![CDATA[Previous Projects (Jan 1990 - June 1998)]]></category>
		<category><![CDATA[Storage Tanks & Asbestos Cleanup]]></category>

		<guid isPermaLink="false">http://creekside.davidmihm.com/?p=292</guid>
		<description><![CDATA[Prepared a permit application which required a comprehensive site and manufacturing process assessment, an inventory of hazardous materials and waste storage, calculation of on-site chemical containment capabilities, preparation of an Emergency Notification and Spill Prevention Plan, spill notification procedures, and Solvent Management Plan.]]></description>
			<content:encoded><![CDATA[<h3>Circuit Technologies, Inc., Redmond, Washington<br />
Owner/Principal Brent Jorgensen Served as Project Manager. </h3>
<p>Prepared a permit application which required a comprehensive site and manufacturing process assessment, an inventory of hazardous materials and waste storage, calculation of on-site chemical containment capabilities, preparation of an Emergency Notification and Spill Prevention Plan, spill notification procedures, and Solvent Management Plan.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.creeksideenvironmental.com/projects/wastewater-notification-cleanup.htm/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
